Contruction Case Studies
-
Brick Substation
11 Kv Substation designed and constructed to deliver renewable energy from the existing solar system to the new regional RFCA headquarters and completed within twenty weeks.
-
Bridge Design and Build
Concrete road and steel safety barriers replacement to a 50 ton bridge on a military camp involving environmental permissions, specialist scaffold to span the river, 12 ton heavy duty steel safety barrier was embedded into the concrete substructure and delivered within a six week programme.
-
Deep Level Sump Pump Platform
Bespoke access platform to assist with sump pump maintenance was constructed 42m underground whilst the original system was still operational, providing much needed level access to large pumps with the aid of an electric overhead hoist
-
High Security / Flood Door
Bespoke steel and seal alterations to a high security / flood door carried out with very confined access for men and equipment within a deep level subterranean complex.