PROJECT OVERVIEW
Client: MOD
Location: Merseyside
ADVANCED EV CHARGING
Task Contract Solutions Ltd successfully delivered an advanced electric vehicle (EV) charging infrastructure at Altcar Training Camp HQ, supporting the Ministry of Defence’s ongoing commitment to decarbonisation. This project represents a significant step toward sustainable operations by leveraging renewable energy to power EVs and reduce the camp’s carbon footprint.
PROJECT SCOPE
Installation of EV Charging Infrastructure:
Installed 4no 22kW EV chargers designed to simultaneously support up to 12 electric and hybrid vehicles, ensuring reliable and efficient charging.Chargers were strategically positioned for ease of access and to optimise the camp’s vehicle charging operations.
Integration with Renewable Energy Sources:
The charging system was designed to utilise solar energy generated by the camp’s existing photovoltaic (PV) system during daylight hours, maximising renewable energy use and reducing reliance on grid power.
This integration ensures sustainable operations by aligning energy consumption with renewable generation.

-
Conducted a comprehensive site assessment to determine the optimal placement of chargers, ensuring efficiency and accessibility.
Designed and installed a robust electrical system to integrate EV chargers with the solar energy infrastructure, prioritising load management and energy efficiency.
-
Configured the chargers to prioritise solar energy usage during daylight hours, aligning with the camp’s decarbonisation strategy and reducing overall operational costs.
-
The new charging system provides a weekly carbon savings of 93 kg CO₂, contributing significantly to the camp’s sustainability goals.
By charging vehicles twice per week, the system eliminates the need for 90 litres of fuel weekly, further supporting the reduction of fossil fuel consumption.
-
The chargers were selected and installed to accommodate the growing demand for EVs, ensuring the camp is equipped to expand its electric fleet in the future.
TECHNICAL DETAILS
PROJECT DELIVERY AND TIMELINE
Task Contract Solutions Ltd completed the project efficiently and to the highest standards, ensuring minimal disruption to the camp’s operations. The installation was seamlessly integrated into the wider decarbonisation strategy of Altcar Training Camp, reinforcing its commitment to sustainable practices.
OUTCOME
The installation of these EV chargers not only provides the infrastructure to support the camp’s transition to electric and hybrid vehicles but also demonstrates the feasibility of combining renewable energy systems with modern transportation needs. The project significantly contributes to reducing the environmental impact of operations while achieving measurable fuel and carbon savings.
By delivering this project, Task Contract Solutions Ltd continues to support the Ministry of Defence’s vision for a sustainable and energy-efficient future, underlining our expertise in renewable energy solutions and infrastructure modernisation.