PROJECT OVERVIEW
Client: Openreach
Location: Manchester
TUNNEL LIGHTING REPLACEMENT
Task Contract Solutions Ltd successfully delivered a comprehensive lighting replacement project across 3 kilometres of communication tunnels. The project aimed to address the inefficiencies and operational challenges posed by outdated fluorescent lighting, improving both energy performance and the working environment for personnel.
THE CHALLENGE
The existing fluorescent lighting system in the tunnels presented several critical issues:
High Energy Consumption: The outdated fixtures consumed excessive energy, significantly inflating operational costs.
Frequent Maintenance: The lights required constant maintenance due to their short lifespan and susceptibility to faults.
Poor Illumination Quality: The lighting provided insufficient brightness, creating a suboptimal and potentially unsafe working environment.
THE SOLUTION
Task Contract Solutions Ltd implemented a modern, energy-efficient LED lighting system tailored to the unique challenges of confined space environments.
KEY UPGRADES INCLUDED
Installation of 360 LED light fixtures (1.2m in length) with a 7-year performance warranty, ensuring longevity and reliability.
Adoption of bespoke access podiums to ensure safe installation in confined spaces.
Full recycling of all removed fluorescent fittings to minimise environmental impact.

PERFORMANCE IMPROVEMENTS
-
The new system reduced energy consumption by 65%, saving 16,848 kWh annually.
-
A decrease of 3,554 Kg of CO₂ emissions per year.
-
Maintenance costs were reduced by 40% due to the durability of the LED fittings.
-
Enhanced lighting quality significantly improved visibility and overall staff safety.
PROJECT EXECUTION
The project was completed within 4 weeks, demonstrating Task’s efficiency in managing complex confined-space installations. The team utilised bespoke access solutions to ensure compliance with safety standards and to maintain seamless workflow within the operational tunnel system.
OUTCOME
The project delivered measurable benefits, including:
Substantial energy and cost savings, aligning with sustainability goals.
Improved workplace conditions, fostering greater productivity and safety.
Long-term reliability and reduced operational interruptions due to fewer maintenance requirements.
Environmental responsibility through the recycling of obsolete fittings.
CONCLUSION
Task Contract Solutions Ltd demonstrated its expertise in delivering innovative and sustainable solutions, even in challenging environments. By replacing outdated fluorescent lighting with advanced LED systems, the company not only enhanced operational efficiency but also contributed to the client’s environmental and safety objectives. This project underscores Task’s commitment to supporting infrastructure improvement through cutting-edge, energy-efficient technologies.