PROJECT OVERVIEW


Client: MOD
Location: Merseyside

EFFICIENT SHELTER SOLUTION


Task Contract Solutions Ltd successfully designed and installed a durable and efficient shelter solution for a military parade ground, meeting the high standards of functionality, reliability, and efficiency required by the Ministry of Defence. This project highlights our expertise in delivering high-quality infrastructure tailored to the unique needs of military operations.

PROJECT SCOPE


1. Galvanised Steel-Framed Structures:

  • Designed and erected two galvanised steel-framed troop shelters, built for exceptional durability and resistance to varying weather conditions.

  • Trapezoidal roof sheets were utilised, offering robust protection, effective water runoff, and a streamlined, professional aesthetic look.

2. Covered Lectern Installation:

  • Integrated a fully covered lectern within the shelter design, providing an ideal focal point for parades, training sessions, and ceremonial activities, while ensuring usability in adverse weather conditions.

3. Enhanced Illumination with LED Floodlighting:

  • Designed and installed an advanced LED floodlighting system, ensuring uniform, high-intensity lighting for the parade ground.

  • The lighting design ensures optimal visibility for nighttime and early morning operations, enhancing safety and operational efficiency.

PROJECT EXECUTION

  • Conducted detailed ground surveys to ensure the structural foundation met the highest safety and stability standards.

  • Developed detailed structural designs, adhering to both military and engineering specifications to meet operational and environmental requirements.

  • Executed civil works, including site preparation, foundation laying, and infrastructure integration, ensuring seamless construction and installation.

  • Engineered a robust electrical system to power the LED floodlights, sound system, ensuring reliability, energy efficiency, and compliance with industry standards.

DELIVERY TIMELINE AND EFFICIENCY


Task Contract Solutions Ltd completed the entire project lifecycle—from initial ground surveys and structural designs to the final installation of troop shelters and floodlights—within an impressive 6-week timeframe. This achievement underscores our ability to deliver high-quality results under tight deadlines without compromising on standards or attention to detail.

OUTCOME


The completed troop shelters, equipped with advanced LED lighting and a covered lectern, provide a weather-resistant, functional space for military personnel. This infrastructure significantly enhances the usability of the parade ground for training, parades, and ceremonial purposes, ensuring that the facility is operational in all conditions. 

This project reflects Task Contract Solutions Ltd’s commitment to supporting the Ministry of Defence by delivering innovative, durable, and efficient infrastructure solutions. Through meticulous planning, precise execution, and adherence to stringent standards, we continue to provide dependable support to those who serve.