Openreach Manchester London

PROJECT OVERVIEW


Client: Openreach
Location: London

POWER DISTRIBUTION BOXES


Task played a pivotal role in the successful installation and commissioning of 8 no Blakey Power Distribution Boxes within Openreach’s underground tunnel systems. These tunnels house critical telecommunications infrastructure, requiring robust and reliable power solutions. Task’s expertise ensured the safe, efficient, and sustainable integration of the power distribution systems, meeting the complex needs of this vital network.

PROJECT SCOPE


  • System Installation: Task managed the full installation process, including site assessments, equipment placement, and integration with existing infrastructure.

  • Energy Safety: Ensured compliance with stringent safety standards to protect both personnel and equipment in the confined tunnel environment.

  • Operational Assurance: Conducted rigorous testing to guarantee consistent energy supply and fault tolerance.

KEY FEATURES

    • Designed and implemented systems optimised for the unique environmental challenges of underground tunnels.

    • Utilised durable and fire-resistant materials to ensure long-term safety and performance.

    • Installed cutting-edge circuit protection systems to prevent overloads and electrical faults.

    • Integrated real-time monitoring and fault detection, enabling rapid response to any potential issues.

    • Deployed energy-saving components to reduce operational costs and align with sustainability goals.

    • Systems designed for minimal maintenance and maximum reliability, reducing downtime risks.

HOW WE ACHIEVED IT


  • Expert Installation: Task ensured precise and secure installation, overcoming challenges such as confined spaces and the need to maintain uninterrupted service during the upgrade.

  • Safety First Approach: Implemented rigorous safety protocols throughout the project to protect workers and the telecommunications equipment housed in the tunnels.

  • System Optimisation: Provided tailored solutions to maximise energy efficiency and operational reliability, supporting Openreach’s infrastructure demands.

OUTCOME


  • Enhanced Energy Safety: The tunnels are now equipped with a robust and reliable power distribution system, minimising risks of outages or faults.

  • Operational Efficiency: Real-time monitoring and fault detection systems ensure optimal performance and reduce the need for reactive maintenance.

  • Future-Ready Infrastructure: Task’s forward-thinking approach and installation expertise have delivered a system designed to support Openreach’s evolving needs.

CONCLUSION


Through expert installation and a strong focus on energy safety, Task has successfully supported the modernisation of Openreach’s tunnel systems. This project highlights Task’s commitment to delivering innovative, safe, and efficient energy solutions in challenging environments, ensuring critical infrastructure is future-proofed and sustainable.