PROJECT OVERVIEW


Client: Sunbelt Rentals
Location: Milton Keynes

ELECTRICTY UPGRADE


Task Contract Solutions Ltd partnered with National Grid, the Distribution Network Operator (DNO), to deliver a critical electricity infrastructure upgrade for Sunbelt Rentals, located at No. 1 Bridge Turn Avenue, Milton Keynes. The project involved upgrading the electricity supply from a 100Amp to a 200Amp three-phase connection, ensuring the site’s energy demands are met while bolstering long-term sustainability and resilience.

PROJECT SCOPE


1. Collaborative Infrastructure Development:

  • Road Excavation by National Grid: National Grid carried out road excavation to access and prepare the existing grid infrastructure, enabling a seamless connection to the upgraded power supply. This stage was managed with precision to minimise disruption to local traffic and the surrounding community.

  • Site Excavation by Task Contract Solutions Ltd: Task Contract Solutions handled all on-site excavation work, ensuring compliance with safety standards and preparing the site for the installation of new high-capacity cables and ducts.

2. Cable and Duct Installation:

  • Installation by National Grid: National Grid installed the upgraded cables and ducting required for the 200Amp three-phase supply. The infrastructure was designed to provide reliable energy delivery while being scalable for future renewable energy integration.

3. Restoration and Surface Works:

  • On-Site Backfill and Surfacing by Task Contract Solutions Ltd: Task Contract Solutions completed the backfilling of the site excavation and reinstated the surface with durable materials, ensuring the site was restored to its optimal operating condition.

  • Road Backfill and Surfacing by National Grid: National Grid managed the backfilling and resurfacing of the excavated road sections, restoring it to its original state to minimise disruption to the surrounding area.

OUTCOMES AND BENEFITS

  • The upgraded 200Amp three-phase supply ensures Sunbelt Rentals can meet growing energy demands, providing reliable power for critical operations and future expansion.

  • The infrastructure upgrade at No. 1 Bridge Turn Avenue was designed with future energy needs in mind, offering the capacity for renewable energy integration, such as solar or wind power systems, and energy storage solutions.

  • The collaboration between Task Contract Solutions Ltd and National Grid ensured the project was completed efficiently, minimising operational downtime for Sunbelt Rentals and disruption to the local community.

  • By leveraging sustainable construction practices and materials, the upgraded infrastructure not only addresses immediate energy needs but also contributes to the long-term sustainability goals of Sunbelt Rentals and the wider community.

CONCLUSION


The electricity upgrade at Sunbelt Rentals in Milton Keynes demonstrates Task Contract Solutions Ltd’s expertise in delivering energy infrastructure projects in collaboration with National Grid. This project ensures enhanced energy security, operational reliability, and future readiness, aligning with Sunbelt Rentals’ sustainability goals and the broader push toward a resilient, net-zero energy future.